Thursday, November 21, 2019

Week 12 - 16 ( FYP 2)


Activity:

For these 5 weeks, I continue completing my Final report of project. Sometimes I went to meet my supervisor to ask about my final report if anything need to change. Also, during this time I need to change my supervisor because Dr. Reyasudin stop teaching at UniKL BMI and start working at other University. My new supervisor was Abdul Malik Bin Mohd Ali. Below shown the profile of my new supervisor.



Also, at week 14 (1/11/2019), I got my last which talk about the “Workshop on Writing Technical Paper”. In this session, I learnt of the format of writing the technical project based on my project. The maximum page of technical report that can be written is only 8 pages.

After finished my Final Project report, I started writing my technical report and need to send it to FYP unit and my supervisor. 


Wednesday, October 9, 2019

Week 11 ( FYP 2 )


Activity:
The Final Year Project presentation was conducted at Dewan Gemilang British Malaysian Institute at 8am to 12.00pm.

Assessor:




The figure above shows the profile of the assessor that will assess my presentation. It should be two assessors.  unfortunately, Dr. Kanendra cannot came when the Exhibition Day. Then the accessor was replaced from the INT Innovation Sdn. Bhd. named En. Izham Bin Nordin. The figure below shows the profile of the accessor from industry. 


Also, below shown the activities during the Exhibition Day. 




Wednesday, October 2, 2019

Week 10 ( FYP 2 )


Activity:

For this week, I attend the 3rd briefing for FYP2 which talk about “FYP 2 Exhibition Day and Submission date for Final Report and Technical Report”. In this section, the FYP 2 coordinator explain about the tentative during the Exhibition Day. Each of the student will had 2 assessors to access us. As for me, I got Madam Norrolhoda Bt Sanif and Dr. Kanendra Naidu Vijyakumar to access me to my presentation.
As for the banner, I already print it out last week. The banner was containing the objective, project description, methodology, flowchart, result and conclusion of my project. Below shown the banner that been printed out.


Saturday, September 28, 2019

Week 9 ( FYP 2 )


Activity:
This week, I continue to collect the data from the project. Based on previous data, the brown turbine was selected to further experiment because it has the highest average of voltage generated by the AC generator. Then the brown turbine was tested by using 2 different water flow rate which is 1000 ℓ/h and 1500 ℓ/h.  Below shown the data of voltage, current, and power generated by using 1000 ℓ/h.
Time Taken, s
Voltage, V
Current, mA
Power, mW
1
1.83
4.1
7.50
2
1.78
3.4
6.05
3
1.82
4.2
7.64
4
1.8
5.5
9.9
5
1.92
9.6
18.43
6
1.66
2.4
3.984
7
1.8
1.3
2.34
8
1.88
12.1
22.74
9
1.89
5.1
9.639
10
1.86
7.6
14.13
11
1.86
10.1
18.78
12
1.92
13
24.96
13
1.9
10.1
19.19
14
1.84
6.8
12.51
15
1.91
10.4
19.86
16
1.68
9.1
15.28
17
1.76
8
14.08
18
1.92
9.5
18.24
19
1.76
4.2
7.39
20
1.75
6.2
10.85

            Next, the table below shown the data of voltage, current, and power generated by using 1500 ℓ/h.
Time Taken, s
Voltage, V
Current, mA
Power, mW
1
1.9
3.3
6.27
2
1.96
19.2
37.63
3
1.82
15.9
28.93
4
1.89
20
37.8
5
2.1
13.9
29.19
6
1.66
11.6
19.25
7
2.15
13.3
28.59
8
2.25
38.1
85.72
9
2
3.3
6.6
10
2.1
5.8
12.18
11
2.22
32.6
72.37
12
1.78
30.4
54.11
13
2.14
2.7
5.77
14
2.26
17.1
38.64
15
2.22
33.7
74.81
16
2.1
37.5
78.75
17
2.12
1.2
2.54
18
2
1.15
2.3
19
2.1
8.9
18.69
20
1.72
27.7
47.64

From the 2 table above, I generate a graph of power based on the power generated by the different flow rate. Then the conclusion been made.



After the data being collected, I started to make a preparation for FYP 2 Exhibition Day. I completed the slide shows that will be used when the presentation occurs and make a final check up for my project running smoothly when presentation.